Sinotruk Second and Third Gear Shift Fork Shaft Assembly Wg2214220017 Wg2212220006
HomeHome > Products > GEAR ASSEMBLY > Sinotruk Second and Third Gear Shift Fork Shaft Assembly Wg2214220017 Wg2212220006
Sinotruk Second and Third Gear Shift Fork Shaft Assembly Wg2214220017 Wg2212220006

Sinotruk Second and Third Gear Shift Fork Shaft Assembly Wg2214220017 Wg2212220006

FAQ Q1: Can you also supply Heavy Truck parts? A1: Yes, We specialize in Sinotruk, Shacman, such as HOWO, Shacman F3000,
Basic Info.
Model NO. WG2214220017 WG2212220006
Brake System Parts Brake
Transmission System Parts Gearbox
Steering System Parts Operating Mechanism
Color Black
Main Market Southeast Asia
Working Mode Power Combining
Usage Heavy Duty Trucks
Voltage 24V
Electromagnetic Clutch Dry-Type Multidisc Electromagnetic Clutch
Working State Semi Linkage
Classification Hydraulic Clutch
Stroke 4 Stroke
Part Clutch Plates
Material Steel
Transport Package Wooden Carton, Neutral Box or Plastic Outside Pack
Specification 95mm x 150mm x 89mm
Trademark LIANWO
Origin China
Production Capacity 20000PCS/Year
Product Description

Sinotruk Second and Third Gear Shift Fork Shaft Assembly Wg2214220017 Wg2212220006

1Long standing reputation in this field
2Specialization is standard and accurate meet your requirement
3OEM quality standard guaranteed
4Product upgrading and expansion of species
5Good quality with competitive prices.
6Flexible and convenient logistic service.
7Excellent and high-quality control
8Long lasting working life time.
9Sufficient storage

Sinotruk Second and Third Gear Shift Fork Shaft Assembly Wg2214220017 Wg2212220006

Sinotruk Second and Third Gear Shift Fork Shaft Assembly Wg2214220017 Wg2212220006


Sinotruk Second and Third Gear Shift Fork Shaft Assembly Wg2214220017 Wg2212220006


Sinotruk Second and Third Gear Shift Fork Shaft Assembly Wg2214220017 Wg2212220006


FAQ
Q1: Can you also supply Heavy Truck parts?
A1: Yes, We specialize in Sinotruk, Shacman, such as HOWO, Shacman F3000,F2000, etc.
Q2: What's the MOQ?
A2: Usually MOQ is according to different products,5 -10PCS/model for stock items.
Q3: What's the delivery time?
A3: It takes 5-7 days if there is stock, and takes one month if there is no stock.
Q4: What's the payment term?
A4: All by T/T, 30% in advance, 70% balance before shipping; option: L/C at sight.
Q5: What's the packaging?
A5: Neutral packing or customer make packing
Our Services
- OEM Manufacturing is welcome: Product, Package...
- Customized design exclusive sealing products
- Specially designed for SINOTRUK, WEICHAI series
- Installation guide
- Product maintenance training
- Free sample for your test
- We will reply your inquiry in 24 hours